The UK's advanced manufacturing ambitions depend on sites that can support industrial-scale development. Land availability and planning remain important, but assess to reliable, affordable electricity is increasingly influencing advanced manufacturing investment decisions. For developers and manufacturers, this makes 'powered land' critical: sites where sufficient energy infrastructure can be delivered within the development programme and at a commercially viable cost.  

The UK is seeking further investment in advanced manufacturing, including battery production and turbine manufacturing. These facilities can have huge electricity requirements, making access to power an important part of deciding where to build.  

A prospective site may offer suitable land and good transport connections. Still, the investment case can change considerably if the electricity supply cannot be delivered within the proposed construction programme. Where major network reinforcement is required, the resulting costs and connection timescales can influence whether a manufacturer proceeds with development or considers another location.  

Power is an early investment decision

Industrial electricity demand is very process dependent. A battery giga-factory will have a very different demand profile from a precision-engineering site, and businesses introducing electric heating will face a significant change to their existing supply.  

Understanding the requirements early enables developers to determine the required capacity and how demand might change as production ramps up. Supply reliability is just as important, especially where an interruption could affect sensitive equipment or cause costly production delays.  

Developers need to consider the site’s energy strategy alongside its land and planning position. A grid connection offer will tell you what’s possible, but you’ll need to go further to establish what reinforcement may be required and how that might impact the programme. You also need to look at electricity costs, particularly for energy-intensive manufacturers, where they will be a major component of running costs.  

Britain’s electricity connections system is being reformed with National Energy System Operator (NESO) introducing a range of changes which are intended to give preference to projects that can demonstrate they are ready to move forward. The reforms aim to create a more effective connections process – though developers will need to establish technical and commercial feasibility of supplying individual sites.  

By engaging with operators early on, developers can identify potential constraints and make amendments to the strategy as needed.  

More than a grid connection

Identifying suitable industrial land requires an understanding of the wider infrastructure needed to support manufacturing operations. Transport access and water availability can affect a site’s viability, along with environmental requirements and the physical space needed for production facilities to expand.

Depending on how the facility is built, the developer may also need to consider private-wire, on-site generation, and battery storage to improve resilience and manage electricity costs. The appropriateness of any of these options will depend on the site’s operational requirements and the commercial options available. It’s important to assess these during the site selection process, as it will give the developer an appreciation of how different energy strategies might impact the performance of the development over the long term.  

Waste heat recovery is another opportunity worth considering during this process.  

Many manufacturing processes generate heat that is released through cooling systems or other equipment. Depending on its temperature, this heat may be suitable for reuse within the facility, reducing the energy required for other operations. Where internal demand is limited, recovered heat could potentially be supplied to neighbouring businesses or a local heat network.  

The feasibility of these arrangements depends heavily on the location and operating requirements of the facilities involved. Cundall’s own research into waste heat recovery, which examines data centres across different markets, demonstrates how local energy systems influence the carbon savings that can be achieved. Many of the same considerations apply to industrial manufacturing.  

Lower-temperature heat sources may need to be boosted with heat pumps to make the energy useful, which in turn increases electricity demand. The distance between the source and the potential users is also a factor – particularly where a lot of pipework is required. There also needs to be sufficient demand when the heat is available. A factory running on a shift pattern is a good example; it will be producing heat when the surrounding buildings may be quite low on their heating requirements.  

Understanding these relationships early can affect facility location and the design of energy infrastructure. In the right circumstances, proximity to potential heat users could strengthen the commercial case for a site and reduce environmental impact.  

Regions need a clearer approach to industrial development

Advanced manufacturing investment can create substantial economic opportunities for the regions where facilities are located. Large production sites can attract suppliers and encourage further industrial development, particularly where businesses benefit from being close to one another.  

In areas with several proposed major developments, combined electricity demand may exceed the capacity currently available. This makes it very difficult for network operators to plan future investment and for developers seeking certainty about connection dates.  

Regional authorities can help address this by working more closely with network operators to understand anticipated industrial growth and the infrastructure required to support it. Developers also have a responsibility to provide realistic assessments of their future electricity requirements, allowing investment to be planned around projects with credible delivery programmes.  

There may also be scope to coordinate infrastructure across industrial clusters. Where a number of businesses are developing facilities in the same area, there could be opportunities to share energy infrastructure. This would reduce duplication and improve the commercial case for projects.  

Transitioning from land to delivery strategy

To attract advanced manufacturing investment, you need a much more integrated approach to site selection. Developers must understand the viability of grid connection and the associated costs before they commit serious capital. They need to consider how the energy infrastructure could support future growth and whether opportunities like waste heat recovery could enhance the plant’s performance during its lifetime.  

Regional authorities have an important role in ensuring that infrastructure planning reflects the needs of prospective manufacturers and the wider opportunities created by industrial development.  

Powered land will play an increasingly important role in the UK’s manufacturing future. Locations that can demonstrate a reliable route to electricity supply, supported by realistic development programmes and a clear understanding of operational requirements, will be better placed to attract manufacturers seeking long-term certainty. 

If you are assessing an industrial site, our Energy team can help evaluate connection constraints, infrastructure options and the energy strategy required to support development.  