Cadent Gas HQ

A redesigned office space complementing Cadent’s transition to becoming a company focused on green-energy.

Reception area, sofas and coffee table in centre, green wall behind, lift shaft far right

Sectors

Location

Coventry, United Kingdom

Client

Cadent Gas

Architect

Resonate

A Cat A and B fit-out of a 90,000 ft² (8,361m²) new build office development and multi-storey carpark at Anstey Business Park in Coventry. Cadent Gas will be the sole tenant. The building accommodates approximately 750 workstations over three levels with a central atrium. Amenities include meeting and training rooms, a commercial kitchen and canteen area, gym, and breakout areas. Several critical system spaces, such as MER and SER, are also provided, along with a disaster recovery facility, including a technical room and control room.

Our multi-disciplinary consultancy team worked closely with Cadent and the client-side design team throughout the project. A set of Employer’s Requirements were developed for the Cat B fit-out, to function as a brief to the developer and the Cat A team or the proposed combined Cat A & B fit-out. Whilst no formal WELL Building accreditation is proposed, a health and wellbeing review was carried out by our team and key outcomes have been integrated into the proposed design.

Paul Kenyon, Partner commented 'Having worked on previous projects for Cadent Gas, it was great to help deliver this state of the art headquarters which will be critical in maintaining and operating their national infrastructure.'

Key fact

The scheme has been awarded first-class BREEAM and EPC A+ ratings.

1/3

Key fact

This project has been acknowledged as one of the Midlands and Central England’s most outstanding workplaces.

2/3

Key fact

Despite changing locations, Cadent Gas confirmed zero job cuts with staff having the choice of either working from home or moving to Ansty Park.

3/3

Paul Kenyon with office background

Paul Kenyon

Partner, Building Services

View bio

We worked closely with Cadent to reduce the build’s carbon footprint by using locally sourced materials and the latest technology and energy saving measures.