Hong Kong Children’s Hospital

LocationHong Kong, China 
ServicesSustainable design
Sector Healthcare
ClientArchSD, HKSAR
D&B China State Construction and Shuion JV
Contractor
Architect Simon Kwan & Associates

Jonathan Yau

T +852 2566 6260

The Children’s Hospital is the largest Design & Construction building project to date from the Architectural Service Department of HKSAR, when measured by contract sum. This is also the first specialist Children’s Hospital in Hong Kong.

Cundall is part of the design and build project team which has won the tender stage design competition and has been appointed to provide sustainability and BEAM consultancy services during the contract stage of the project.

The project has set ambitious sustainability targets to provide world-class healthcare facilities in the region and is targeting BEAM Plus certification. In parallel, Cundall has introduced many cutting edge technologies that will not only maximise environmental performance but also improve the patients’ experience.

  • The building form has adopted a “twin tower” design to enable win to pass through the development. Open courtyards and atrium will facilitate air movement around the site. The proposed development as extensive green landscape achieving 40% of green ratio to reduce heat island effect. In addition, more than 50% of the roof is covered by high sola reflective materials to further reduce heat island effect.
  • For air quality, the project has achieved 30% more fresh air than ASHRAE62.1 provision. The air-conditioning system can also operate “full fresh air” free cooling for areas suitable to do so. Internally, the hospital generally has high performance filters to further air quality.
  • For daylight, the building form is in H-shape to enable all wards to have daylight and view access. With two large atrium in the middle of towers, daylight can be distributed to inner space of the building to maximise daylight access.

The project has achieved BEAM Plus Platinum Provisional Assessment rating under BEAM Plus version 1.2, which is first hospital in Hong Kong has achieved this rating.

 

Image Alt
Projects

Hong Kong Science Park, Phase 3

Cundall have been appointed as BEAM, LEED and sustainability consultant for the project of Science Park Phase 3, aiming to achieve one of Hong Kong’s first LEED v2009 Platinum rating and a HK BEAM Plus Platinum rating.  

Read more
Royal Children’s Hospital interior
Projects

Royal Children's Hospital

The Royal Children’s Hospital in Melbourne, which opened in 2011, is based on ‘state of the art’ ideas developed by the Hospital around a family-centred care model that puts children and their parents at the heart of the facility.

Read more
South Australian Health and Medical Research Institute (SAHMRI)
Projects

South Australian Health and Medical Research Institute (SAHMRI)

The South Australian Health and Medical Research Institute (SAHMRI) is the first project in South Australia and the first laboratory building in Australia to achieve LEED Gold certification.

Read more
Services

Cundall's engineering consultancy services cover the entire life cycle of any building project. Clients find our ‘total solutions’ approach saves them time, money and effort.

We will add value to your project by opening our minds, exchanging ideas and thinking creatively.

Sectors

Cundall's expertise extends to all major markets, so we have a deep understanding of the specific issues, constraints and opportunities facing our clients' market sectors.

Our team of creative engineers draw on our accumulated knowledge to devise the best possible solutions for your project in a fully integrated and cost-effective way.

About us

Established in the UK 40 years ago, Cundall has developed into an international multi-disciplinary consultancy operating from over 20 locations across the globe.