View All Projects (A - Z)
The project comprised of the conversion and refurbishment of the top two apartments into a new penthouse apartment with an extensive roof terrace on this Chelsea mansion block.
240 Regent Street was transformed into a stunning mixed-use development in the heart of London’s West End. The building combines quality retail, office and restaurant spaces. It is now a vibrant landmark.
This 5 bedroom house, located in Kensington, was newly constructed behind the original façade. The property was built around a steel frame, which provided lateral open space. Cundall designed all the services included for a high-end developer.
This development is a new high-performance 50m swimming pool for the Educational Institute of Scotland (EIS), for use by both elite athletes and students. The centre has facilities for both Sports Science and Sports Medicine. All of the facilities are suitable for use by disabled swimmers and athletes.
The complex more than doubled in size, and it was transformed through refurbishment into a state of the art fitness centre, attracting a substantial increase in visitors. A pool and changing village were added to the existing building, which dated back to the 1950’s.
The Arc Leisure Matlock (formerly known as Central Area Leisure Centre, CALC) scheme provides an innovative and exciting new regional sport and leisure facility for local people and visitors to the Peak District. The centre was officially opened in 2011 by Lord Sebastian Coe.
The Baddiley-Clark Building brought together a critical mass of world-leading bacterial cell biologists and provided them with state-of-the-art facilities in which to push the boundaries of research and knowledge. This building is an excellent example of innovation and a flexible building within a challenging tight site. As a result of the sustainable design used for the building it achieved a BREEAM 'Excellent' rating.
The new 30,000m2 manufacturing facility for BAE Systems sees the replacement of the existing First World War facility to provide employees with a modern, safer, highly automated, energy-efficient and flexible place of work.
Barrhead Health and Social Care is a new 5,700m2 building that provides both healthcare facilities for the communities in and around the Barrhead area of Renfrewshire and office accommodation for Renfrewshire Council staff.
Bede Academy provides nursery, primary and secondary provision across two sites in Blyth on the Northumberland coast. The new layout is over three storeys in order to minimise take up of valuable site area on this restricted site.